QLD2032
Built 1 November 2026
Business profile

Arrb

Arrb has won 25 disclosed Queensland Government contracts worth $20.0M, with award dates from Mar 2013 to Jun 2025.

All disclosure years, as published

Government contracts

$20.0MTotal disclosed value, all years$19,991,555
25Contracts disclosedMar 2013 to Jun 2025
1Agency namedin 9 awards, Apr 2016 to Jun 2025

Agencies they win from

9 awards name an agency · Apr 2016 to Jun 2025
  1. Transport and Main Roads$4.9M
    9 contracts

Source: QLD Government contract disclosures (CC BY 4.0), as published, built 1 Nov 2026. Disclosed value is the amount published in government disclosure logs. It includes multi-year and whole-of-life contracts and is not cash received.

Agencies and recent awards: the 9 awards held with a full award date, Apr 2016 to Jun 2025; 9 name an agency. The totals above count every disclosure held, including those without a full award date, which aren't listed here.

Recent awards

Newest first · the latest 9
  1. 22 Jun 2025$165K
    Accelerated Loading Facility Business Case
    Transport and Main Roads
  2. 01 May 2025$34K
    CN-24912 SNO HERE Traffic Data Portal R100 Map update
    Transport and Main Roads
  3. 15 Nov 2021$2.6M
    Pavement Condition Assessment- Data Collection Performance Agreement The Data Collection Performance Agreement (DCPA) is between TMR's Portfolio Investment & Programming (PIP) branch and Australian Road Research Board (ARRB) Group. This agreement will be managed by Transport System Asset Management (TSAM) on behalf of PIP and the data collection will be carried out by ARRB. It includes data collection for road surface condition, road geometry and Digital Video Road (DVR) for roads and will remain in force for the period of July 2021 - June 2022.
    Transport and Main Roads
  4. 01 Nov 2021$1.0M
    Long Line Retro data collection and Re-marking programming The purpose of the project is to collect the delineation condition of long lines on TMRs sealed road network, analyse the data with consideration of condition and the road priority matrix in the TMR Element 24 management plan and road safety risk in dry and wet environments to model a draft repainting program. The quantitative data approach allows for model-based repainting programming that considers: • Safety risk to identify if roads are candidates for delineation that provides wet weather performance (e.g. wet weather performance line marking paint/beads and/or raised reflective pavement markers). • Identification of homogeneous segments within road segments that require repainting or may be candidates for a more durable paint/bead option.
    Transport and Main Roads
  5. 23 Jun 2021$598K
    MTR Heavy vehicle impact study in South Brisbane Heavy vehicle impact study in South Brisbane
    Transport and Main Roads
  6. 17 Nov 2020$151K
    ET Third-Party Inspectorate for Routh Creek CFRP Strengthening (S53 Nacoe Project) ET Third-Party Inspectorate for Routh Creek CFRP Strengthening (S53 Nacoe Project)
    Transport and Main Roads
  7. 30 Jun 2020$19K
    PR1371 Samford Road and Osborne Road Intersection Upgrade FWD Testing PR1371 Samford Road and Osborne Road Intersection Upgrade FWD Testing
    Transport and Main Roads
  8. 13 Dec 2017$229K
    NCD - Engaging Consultant to undertake SCRIM skid testing NCD - Engaging Consultant to undertake SCRIM skid testing
    Transport and Main Roads
  9. 01 Apr 2016$55K
    Whole of Life Costs Safety Barriers Determine the whole of life costs for various road safety barrier types
    Transport and Main Roads

ABN on record

None linked to this name

No ABN is on record for this name: none was disclosed with it on the contracts held, and no register match has been found.

Official sources

How this page counts

Totals combine every contract disclosed under this name, with spellings that differ only in capitals or punctuation counted together. Other names are combined only after review, so one business can have more than one page. A contract re-listed across disclosure files counts once, at its highest value, where the files give a contract reference; older disclosures are counted as published, so totals are upper bounds. Award lines are shown as published. Figures are indicative and subject to revision.

Corrections within 24 hours: [email protected]